Temporary works for deep excavation
Sector: Civils (London)
- TW checks (BS 5975)
- GA & details in CAD
- ITP & risk assessment
Outcome: Zero incidents, works delivered 1 week earlier than programme.
Design management & preconstruction support
Sector: Utilities (UK)
- Design risk register
- CRL reviews
- Methodology & sequence
Outcome: Won the bid; reduced prelims by 8% via optimised sequencing.
As‑built model & O&M pack
Sector: Residential (SE)
- Point cloud integration
- As‑built drawings
- O&M + handover docs
Outcome: Snag‑free handover; reduced client queries post‑PC by 60%.